Customer story

How a motorcycle dealer adds 30% more workshop appointments in spring

CSB Editorial

A brand dealer in Lower Saxony, in business for 40 years, 6 employees, a workshop with 3 lifts. Until two years ago, workshop planning ran on a mix of wall calendar, phone notes and a spreadsheet that was usually out of date by evening.

After switching to the CSB workshop calendar and structured intake, utilisation in spring 2026 changed measurably.

The starting point

  • 3 lifts, fully booked through spring – but not always optimally allocated
  • Phone enquiries were captured on paper and transcribed into a spreadsheet in the evening
  • Double bookings happened, customers had to be rescheduled
  • Workshop time tracking was separate – transferring to the invoice was a margin leak

What changed

With CSB, the workshop calendar runs straight from order intake. Whoever calls gets a firm appointment immediately. The lift is reserved with the booking. When the mechanic logs time and parts, they automatically land on the order and the invoice – not days later.

We didn't add staff. We didn't add a lift. We just have the system that tells us when and where we have capacity. In April, that's 30% more appointments than last year – with the same crew.

Takeaways

  • The workshop bottleneck is often a visibility problem, not a staffing problem
  • Structured intake removes the end-to-end chaos
  • When time and parts land directly on the order, margin stays intact

Let's talk about your shop – not about our software.

We're on the line: Effi and Aaron from sales get back to you personally – no call center, no script.